Our Services

Land Survey Team assures its best services for all types of surveys and sub soil investigation. Daily affairs of Land Survey Team is attended by the Managing Director with highly accomplished professionals and staffs for solving problems.

Hydro Graphic Survey

Land Survey Team conducts hydrographic survey with the use of winprofile, hydro pro, surfer and AutoCAD software. Experienced and qualified staff and officials are engaged to conduct survey works efficiently. Some of our completed projects with some sample drawings are given below:

EXPERIENCE AND CAPABILITY RIVER SURVEY

Year Name of Client Name and location of Project Contents of Work

2003-08

Executive Engineer
O & M Division, BWDB, Chandpur
Jamuna – Meghna River Erosion Mitigation Project (JMREMP/M-1, M-15, M-16, M-18) at Ekhlaspur To Mohonpur (River Bank and wave Protection By Dumping and Placing sand filling, Geo-textile bags and concrete blocks of Meghna River) Bathymetric Survey & Land Survey works for the project
310 Cross Section Taken @ 10m Interval
(Pre Work & Post Work)

2003-04

Ministry of Water Resources Bangladesh Water Development Board,
Directorate of Planning-1.
Chandpur Comilla Integrated FCDI Project. Consultants HCL-KRANTI-BETS-DPM,

Second Small Scale water Resources Development Sector Project,

Irrigation Development In South Comilla North Noakhali Drainage Project.

Zianagar To Hularhat FCDI Project.

Buri-Titas Irrigation and Drainage Project.

Arial Beel FCDI Project.

Kushiara Bijna Project, Sherpur, Hobigonj.

Bathymetric Survey, Engineering Survey work To Carry out the Cross Sections of Canals and Rivers and Spot Map
1193 Cross Section Taken @ 500m Interval

2005-06

Directorate of Planning-1 (BWDB, Dhaka) Patuakhakli Town Protection Embankment Project, Patuakhakli, Barisal.

Lalmohan-Charfesson Water Management Project, Lalmohan, Bhola.

Hatia-Nijhum Dwip Cross Dam Project, Hatia, Chittagong

Upgrading Of Polder 73/1a+B & 73/2 Under Coastal Embankment Rehabilitation Project

Improvement Of Navigation And Environment Of The Karatoya River In Bogra Town Project

Bathymetric Survey, Engineering Survey works to Carry out the Cross Sections and Long Sections of Khals and Rivers and Spot Map with Project Map

2008

Banglalink
Brothers Construction
Nikunjo, Dhaka
Mawa To Janjira Fiber Optical Cable Line Project Mawa, Munshiganj of Meghna River Bathymetric Survey
11 Cross Section Taken @ 50m Interval

2008-10

AS – TSL – (JV)

HB-TI  JV

Bhuiyan Mansion (2nd Floor)
6, Motijheel C/A. Dhaka

Jamuna – Meghna River Erosion Mitigation Project
Koitola to Mohanganj at PIRDP  of Jamuna River
(Contract Package No.JMREMP/P9/2008)JMREMP/P10/2009) &JMREMP/PIRDP/W-1-2009.
Of Padma River
Bathymetric Survey & Land Survey works for the project
310 Cross Section Taken @ 5m Interval
(Pre Work & Post Work)

2008-11

M/S. ISMAIL HOSSAIN
9, Segun Bagicha, Dhaka-1000.
Chenchuri Beel Sub–Project BWDB, Nabongonga river at Chanderchar from Km 64. 0055/0.000 to Km 64.880/0.950
Riverbank slope protection by dumping of sand filled Geo-Textile Bags and wave  above Low-Water Level (LWL) cc block along the right bank of the Nabongonga river at Chanderchar at Nabaganga Riber
Bathymetric Survey & Land Survey works for the project
96 Cross Section Taken @ 10m Interval (Pre Work & Post Work)

2009-10

Bangladesh Water Development Board.
BWDB, Dhaka
Works in connection with the implementation of Hydrographic Survey by M.V. Anwesha under Survey & Study Division, BWDB during the year 2009-10 Bathymetric Survey for the project
1200 Nos. Cross Section Taken @ 1.0 km Interval

2009-10

Executive Engineer
Faridpur O & M Division,
BWDB, Faridpur
Protection of Charbhatpara
Regulator & Embankment of Purulia Charbhatpara FCDI Project at Upazila: Kashiani, Dist: Gopalganj
Bathymetric Survey, Land Survey & Topographical Survey  works for the project 151 Nos. Cross Section Taken @ 10m Interval

2009-11

Executive Engineer
Jamalpur O & M Division,
BWDB, Jamalpur.
River Bank Protection Work On The Left Bank Of Jamuna River  From Bahadurabad Ghat To Futani Bazar ( Ch : 1200.00m To Ch :8500.00m ) In Upazilla : Islampur, Dist: Jamalpur, at
Jamuna River
Bathymetric Survey, Land Survey & Topographical Survey  works for the project 1461 Cross Section Taken @ 5m Interval (Pre Work & Post Work)

2010-11

KHULNA WASA
NJS CONSULTANTS CO.LTD.
Khulna Water Supply Improvement Project
Apil gate at Bhairab River, Khulna
Modumoti River, Mollahat
BIWTA Ghat at Rupsha River, Khulna
Bathymetric Survey 18 Cross Section Taken @ 200m Interval

2010

IEL Consortium & associates Ltd.
An Orion Group Company
153 & 154 Tejgaon Industrial Area, Dhaka
Power Plant Project, Meghna River, Meghna Ghat,  Narayanganj. Bathymetric Survey, & Land Survey 21 Nos. Cross Section Taken @ 100m Interval

2010

Maxwell
144 Shantinagar, Dhaka
West Bank Of Jamuna Bridge – Nalka,
Hatikumrul-Ishwardi -Bharamara Gas
Transmission Pipeline Project.
Bathymetric Survey, of Padma River at Pakshi Bridge 6 nos Cross Section @ 100m Interval

2011

Programme Director,
(Executive Engineer),
Netrokona Badc,Nagra,Netrokona
Programme For Construction Of Embankment Near Jaria Market, Purbodhala, Netrokona By Dredging Of Kangsha River. At Near Jaria Bazar P.S. Purbadhala, Dist.Netrokona. Bathymetric Survey, of Kangsha River 220 nos Cross Section @ 20m Interval

2011

Michio OTA
JICA Expert (Advisor on River Management) Bangladesh Water Development Board (BWDB) Wapda Building Motijheel C/A, Dhaka
Digital Topographical Survey, Cross Section Survey & Spot Elevation Of Padma River at Hasail, Tongibari Munshiganj.
Digital Topographical Survey, Cross Section Survey & Spot Elevation Of Padma River at Lohajang, Tongibari Munshiganj.
Bathymetric Survey, Land Survey & Topographical Survey  works for the project 41 Cross Section

Taken @ 50m Interval
51 Cross Section Taken @ 50m Interval

2011

SMEC International Pty Ltd.
House # 402 (1st floor), Lane # 06, DOHS Baridhara, Dhaka-1206, Bangladesh.
Feasibility Study Of  Extra Dosed Railway
Cum Road Bridge Project Of Karnaphuli River, Kalurghat, Chittagong. At Karnaphuli River
Bathymetric Survey, Land Survey & Topographical Survey  works for the project 31 Cross Section Taken @ 100m Interval

2012

Bangladesh Water Development Board
BWDB, Dhaka
M/S Ismail Hossain
9 Segun Bagicha, Dhaka
South-West Area Integrated Water Resources Planning and Management Project
Cross Section of Modumoti River Under Kashiani Upzila of Gopalganj District
Bathymetric Survey & Land Survey for the project 116 Cross Section Taken @ 10m Interval (Pre Work & Post Work)

2012

Bangladesh Water Development Board
Aqua Dredging Ltd.
Bongo Dredging Ltd.
SS  &  RCL  Dredging Ltd.
BGME Bhaban, Kawaran Bazar, Dhaka.
Pilot Capital Dredging, at  Jamuna River Bathymetric Survey 691Cross Section Taken @ 10m Interval
(Pre Work & Post Work)

2012

Bangladesh Water Development Board
M/S Tajul Islam
Pilot Capital Dredging, Pungli River Mirzapur, Tangail. Bathymetric Survey 53 Cross Section Taken @ 50m Interval
(Pre Work & Post Work)

2012

Bangladesh Water Development Board
Aqua Dredging Ltd.
Pilot Capital Dredging, Pungli River Mirzapur, Tangail. Bathymetric Survey 53 Cross Section Taken @ 50m Interval
(Pre Work & Post Work)

2013

Executive Engineer
Jamalpur O & M Sub-Division,
BWDB, Jamalpur.
Jamuna – Meghna River Erosion Mitigation Project ( JMREMP )
Contract Package No.BFB-RBP-24/2011-12
Contour Map at U/S of Futani Bazar of left Bank of Jamuna River of Segment Futani Bazar to Bahadurabad
From ( CH : 000M TO CH :1250.00M ) In Upzilla : Islampur, Dist: Jamalpur,
Under Jamalpur O & M Sum-Division, BWDB, Jamalpur.
Bathymetric Survey 85 Nos Cross Section Taken @ 50m Interval
(Pre Work & Post Work

2013

BANGLADESH  WATER  DEVELOPMENT  BOARD (BWDB) Contract Package No: SWAIWRPMP/P-1/2012-13
Parmamenant River Bank Slope Protection work Along the Right Bank of the
Contour Map of Nabaganga River at Islampur in the month of November, 2013.
At Chainage = 59.860km To 60.360 Km= 0.500 km
Bathymetric Survey 53 Nos Cross Section Taken @ 10m Interval
(Pre Work

2013-14

M/S. ISMAIL HOSSAIN
9, Segun Bagicha, Dhaka-1000.
Chenchuri Beel Sub–Project BWDB, Nabongonga river at Mowli Bazar
Riverbank slope protection by dumping of sand filled Geo-Textile Bags and wave  above Low-Water Level (LWL) cc block along the right bank of the Nabongonga river at Chanderchar at Nabaganga Riber
Bathymetric Survey & Land Survey works for the project
204 Cross Section Taken @ 5m Interval (Pre Work & Post Work)

2013-14

Chittagong water Supply & Sewerage Authority          (CWASA)
NJS CONSULTANTS CO., LTD., JAPAN
In association with
BETS Consulting Service Ltd., Bangladesh
Karnaphuli Water Supply project –phase-2, Bathymetric Survey & Land Survey works for the project
100 Cross Section Taken @ 50m Interval

2014-17

Bangladesh Water Development Board (BWDB)
RMBP PROJECT ALEXANDER ARMY  CAMP
19 ECB, RAMGATI, LAXMIPUR
Protection of ramgati and kamal nagar upazila and adjacent areas under laxmipur district from the continuing erosion of the meghna river, Laxmipur o & m division, BWDB
Bank Protection Works at Char Alexander & Adjoining Areas
(Location -2, Km 132.000 to Km135.500 = 3500m)
Bathymetric Survey & Land Survey works for the project
180 Cross Section Taken @ 20m Interval

2015-16

Bangladesh Water Development Board (BWDB)
SWO – WEST
17 ENGINEERING CONSTRUCTION BATTALION
MIRPUR ARMY CAMP, DHAKA- 1216.
Protective work along the left bank of Padma River adjacent upstream to the main river training works of proposed
Padma Bridge at Mawa -Kandirpara-Joshaldia area from km. 6.00 to km. 7.30 for a total length of 1300m in Louhajong upazila of
Munshigonj District under the Padma Multipurpose Bridge Project.
Bathymetric Survey & Land Survey works for the project
66 Cross Section Taken @ 20m Interval

2015-16

Bangladesh Water Development Board (BWDB)
WEL-NZK- PTSL (JV)
TCB Bhavan, 7th Floor,
1, Kawranbazar, Dhaka-1216
Design of Protective work along the left bank of the Jamuna River from km 6.10 to km 8.10=200 km at Zafargonj Bazar under main river flood and bank erosion risk Management program,tranch-1 in Shibaloy upazila under Manikgonj District under Manikgonj wd Division During the year 2014-15
Contact Package no: W-08/2014/15
Bathymetric Survey & Land Survey works for the project
121 Cross Section Taken @ 20m Interval

2015-17

Muhuri Irrigation Project (MIP)
Bangladesh Water Development Board (BWDB)
Anzdec Limited (NZL) in association with
BETS  Consulting Service Ltd. &
Bangladesh Engineers Ltd.
Estimate for Rehabilitation Costal Embankment, Re-Excavation of Khals Group -1 & Re-Excavation of Khals Group -2 in
C/W IMIP Project under Feni O & M Division, BWDB, Feni during the year 2014-15 & 2015-16
(Package No – CW – 1)0
Bathymetric Survey & Land Survey works for the project
50 Cross Section Taken @ 50m Interval

2014-15

STUP-Scott Wilson & Development Design Consultant JV,47 Mohakhali, Dhaka Topographical & Bathymetric Survey:-2nd Railway Bridge across Bhairob and Titas Rivers along Dhaka Chittagong MG Main Line of Bangladesh Railways Bathymetric Survey & Land Survey works for the project
100 Cross Section Taken @ 20m Interval

2014-15

ILF Consulting Engineers.
BETS Consulting Service Ltd., Bangladesh
Feed& PMC for Installation of a SPM and Pipeline System Moheshkhali, Chittagong Bathymetric Survey & Land Survey works for the project
100 Cross Section Taken @ 10m Interval

2014-16

AS – TSL – (JV) Slope Protection of Embankment by C.C. block including construction of surface drainage outlet structure and River bank Protection work by dumping of sand filled Geo-textile bags including supplement dumping and flood stand by from Koitola to Mohanganj at PIRDP (Contract Package No. JMREMP/P9/2008) & JMREMP/P10/2009) Bathymetric Survey & Land Survey works for the project
50 Cross Section Taken @ 91m Interval

2013-14

Bangladesh Water Development Board, Asian Development Bank
Project Director JMREMP.BWDB, Dhaka.
Conducting Condition (Topographical) Survey for the PIRDP Irrigation Canal Systems in Upazilla Bera and Santhia of Pabna District under JMREMP during the year 2009-10.
Contract Package No. JMREMP/PIRDP/W-1-2009.
Bathymetric Survey & Land Survey works for the project
50 Cross Section Taken @ 150m Interval

2013-14

Bangladesh Water Development Board, Asian Development Bank
Project Director JMREMP.BWDB, Dhaka
Conducting Condition (Topographical) Survey for the PIRDP Irrigation Canal Systems in Upazilla Matlab of Chandpur District under JMREMP during the year 2009-10.
Contract Package No. JMREMP/MDIP/W-1-2010.
Bathymetric Survey & Land Survey works for the project
100 Cross Section Taken @ 18m Interval

2015-16

Bangladesh Agricultural Development Corporation (BADC) Bathymetric Survey Of Char Bashbaria, Dashmina, Patuakhali Bathymetric Survey & Land Survey works for the project
50 Cross Section Taken @ 61m Interval

2015-16

Executive Engineer
Jamalpur O & M Division,
BWDB, Jamalpur.
Jamuna – Meghna River Erosion Mitigation Project (JMREMP)
Bathymetric & Topographical Survey of Bahadurabad Railway Ghat
Footoni Bazar, Dewangonj, Islampur, Jamalpur
Bathymetric Survey & Land Survey works for the project
20 Cross Section Taken @ 51m Interval

2016-17

Executive Engineer
Dhaka O & M  Division-2
 BWDB, Dhaka.
Dockyard and Engineering Works Ltd.
Contract Package No.DPM / Braha Bazar-01/15/16
Bangladesh Navy, Shonakanda, Bandar,
Narayangonj.
Bank Protection work along the left bank of Padma River from
Aurangabad to Braha Bazar Ghat at Dohar Upazila in Dhaka District
under Dkaka O & M Division-2, BWDB, Dhaka
During the Year 2015-16, 2016-17 & 2017-18
Bathymetric Survey & Land Survey works for the project
71 Cross Section Taken @ 50m Interval

2016-17

Executive Engineer
Dhaka O & M  Division-2
 BWDB, Dhaka.M/S Dolly Construction
195 Sena kalyan Bhaban,
Shut No.1602, Motijheel C/A, Dhaka-1000.
Temporary Bank Protection work along the Left bank of Padma River In between
west Narisha Bazar to Meghula Bazar from Km. 2.812 to Km. 3.487 = 675.00 m in connection with Temporary
Bank Protective work along the Left bank of Padma River at west Narisha Bazar and Meghula Bazar at
Dohar Upazila in Dhaka District under Dhaka O & M Division – 2 BWDB Dhaka during the year 2015-16.
Bathymetric Survey & Land Survey works for the project
20 Cross Section Taken @ 34m Interval

2016-17

M/S Dolly Construction
195 Sena kalyan Bhaban,
Shut No.1602, Motijheel C/A, Dhaka-1000.
Bank Protection work along the Left bank of Kalni River at Kadamchal Bazar
From Km. 68.80 to Km. 68.540 = 260m in Upazilla Austogram, Dist: Kishoreganj under
Kishoreganj WD Division,  BWDB Kishoreganj.
Package No : BWDB/Kish/Kalni-Kushi/PW-01
Bathymetric Survey & Land Survey works for the project
13 Cross Section Taken @ 20m Interval

2016-17

Executive Engineer
Manikganj WD Division
Joyra, Manikganj
Bangladesh Water Development Board, BWDB
Flood and Riverbank Erosion Risk Management Investment Program
River Bank Protection Work at Horirampur under Manikganj WD Division, BWDB Manikganj
Bathymetric & Topographical Survey of Padma River,  February 2017
Bathymetric Survey & Land Survey works for the project
161 Cross Section Taken @ 50m Interval

2016-17

Executive Engineer
Manikganj WD Division
Joyra, Manikganj
Bangladesh Water Development Board, BWDB
Topographical & Bathymetric Survey:-Contour Map of Jamuna River  At
Jafarganj Bazar To Paturia,
Shivalaya, Manikganj
Bathymetric Survey & Land Survey works for the project
51 Cross Section Taken @ 100 m Interval

2016-17

BANGLADESH POWER DEVELOPMENT BOARD

EPC Contractor:                   Marubeni Corporation
EPC Sub Contractor: Larsen & Toubro Limited (India)

Bibiyana-Iii, 400 Mw Gas Based Combined Cycle Power Plant Project
Kushiyara River Bathymetric Survey for River Water Intake Channel
Bathymetric Survey & Land Survey works for the project
21 Cross Section Taken @ 10m Interval

2016-17

Bangladesh Water Development Board
Jamalpur O & M Division
BWDB, Jamalpur.
Topographical & Contour Map of
Jamuna River along the
left bank from km. 2.250 to km. 5.200 at Pingna, Sarishabari, Jamalpur District
Bathymetric Survey & Land Survey works for the project
59 Cross Section Taken @ 50m Interval

2016-17

The Executive Engineer, Manikganj W.D. Division, BWDB, Joyra, Manikganj Bathymetry Survey along the Jamuna river from coordinate 23054´71´´N , 89044´48.3´´ E to  coordinate 23048´57.46´´N, 89046´10´´E for preparation of design data for dredging work in Manikganj district under  non development revenue budged during the year 2016-2017 Bathymetric Survey (Deposit work only) Secondary River (Width ≥ 500m) Basis : 200 km-transact: spaced at 200 m interval

2016-17

The Executive Engineer, Manikganj W.D. Division, BWDB, Joyra, Manikganj Bathymetry Survey along the Padma river from km 0.00 to km 11.300 = 11300 m for the assessments of flood damage on the river bed at Horirampur Upazila in Manikganj district under Flood and Riverbank Erosion Risk Management Investment Program (FRERMIP) during the year 2016-2017. Bathymetric Survey (Deposit work only) Secondary River (Width ≥ 500m) Basis : 200 km-transact: spaced at 200 m interval.

2016-17

The Executive Engineer, Manikganj W.D. Division, BWDB, Joyra, Manikganj Bathymetry survey in  the Kaliganga  and Dhalashwari river at 25 location total length 25 km for preparation of design data for bank protection work in Manikganj district under non development revenue budged during the year 2016-2017 Bathymetric Survey (Deposit work only) Secondary River (Width ≥ 500m) Basis : 200 km-transact: spaced at 200 m interval.

Some of Our Works

About us

lstlogo

Land Survey Team has been setup in 1988 to assist development of works with topographic, cadastral, hydrographic and other survey.